Emergency, casualty and outpatient clinics to meet most urgent needs due to devastating floods in South America caused by the powerful “El Niño” weather phenomenon. Supply of 140 disassembled modules, to be assembled in Lima and from a regulatory warehouse, distributed throughout Peru.
The manufacturing process was done in 40 days. Each module consists of 3 rooms of 12 m2, in total 36 m2 installed once deployed.
Project::
Medical center
Client:
Peru Ministry of Health
Location:
Peru