Walls and roof envelop (125 m2 3 meters high). It was built as a repair and maintenance area inside a fruit canning factory. Walls were protected with PVC sheets, to avoid shocks with trucks.
Project:
Repair & maitenance area
Client:
TAISI
Location:
Calatayud, Zaragoza (Spain)